Multi-effect Evaporator Reconstruction to MVR System
In order to reduce the demand for fresh steam, reduce the energy consumption in the evaporation concentrating project and reduce the operation cost, the multi effect evaporator can be reconstructed to a MVR multi effect evaporator.
| S/N | Before modification (Four effect evaporator) |
After modification (MVR Evaporator) |
| Steam cost | 1875RMB/h (7.5tons/h, 250RMB/tons) |
125RMB/h (0.5tons/h, 250RMB/tons) |
| Power cost | 80RMB/h (100Kw.h, 0.8RMB/Kw.h) |
480RMB/h (600Kw.h, 0.8RMB/Kw.h) |
| Cooling water cost | 600RMB/h (200tons/h, 3RMB/tons) |
60RMB/h (20tons/h, 3RMB/tons) |
| Total cost | 2555RMB/h | 335RMB/h |
| Total cost | 1533million RMB (1years, about 6000hours) |
201million RMB (1years, about 6000hours) |
| Energy saving effect | 86% |